Two Storey Office Complex & Component Inspection Area

Bespoke office facility for one of the UK’s leading manufacturer’s of heavy duty flanges and pipework for the gas, oil and petrochemical industries

Scope of Works

To survey, design, manufacture, deliver, and install a two-storey office facility of overall dimensions 17.1m long x 6.4m wide x 5.7m high, fully meeting current Planning Regulations and Building Standards.

Design Considerations

  • The office complex (including a glazed main entrance & reception area with matching glass stairwell to provide a ‘light & airy’ welcoming feel) to be fit for purpose in providing a safe & comfortable working environment for staff, operations and maintenance personnel.
  • Structural steelwork portal frame complete with 2nd floor offices & fully boarded mezzanine floor cladded with insulated composite panels, having internal partitions to form offices, conference room, inspection area’s and fully-equipped amenities such as kitchen & dining area, toilets & wash-room facilities etc.
  • Disabled access, strategically placed glazing in tinted safety glass to oversee production areas whilst offering protection from welding arc glare.
  • Services included air conditioning, suspended ceilings, modular & emergency lighting, mains power & data transfer services, plumbing services, finished floor overlays.

Acoustic Performance

The office construction provided a 30dB reduction from factory ambient noise levels, and room-to-room noise, allowing personnel to effectively communicate in a stress-free, comfortable environment.

Completed

April 2007

Product Type

< >
< >

Industry